Case Study 01 — GCC Setup from Scratch
A mid-size US technology firm building its first India centre
Bengaluru, India · 40+ engineers · 3 months to operations
Challenge
The company needed to stand up an engineering hub in India from zero — no office, no entity, no hires, no local process. They had been burned before: a vendor promised quick setup but delivered compliance missteps and a 10-month delay. The real blocker was never cost. It was governance, talent pipeline speed, and the right operating model for their size.
Approach
We started with a 90-day roadmap, not a 12-month proposal. Week 1: entity structuring (wholly-owned subsidiary vs. rep office — we picked the subsidiary for control and flexibility). Weeks 2–4: office shortlisting (Bengaluru vs. Hyderabad), vendor selection, and a candidate pipeline. Weeks 5–8: first 12 hires (a mix of leads and senior ICs). Weeks 9–12: onboarding, toolchain setup, and first delivery sprint. Throughout, we sat in weekly working sessions with the US leadership — not slide decks.
Results
The centre was operational and delivering within 3 months instead of the typical 6–9. The team grew to 40+ engineers within 12 months. The company saved approximately 35% on fully-loaded engineering costs compared to US hires, while maintaining quality and reducing time-to-market for key features by 20%.
Key Metrics
3 months
Time to Operations